Substation Scout

Warren, OH interconnection queue

1 active project totalling 14 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
14active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF1-249 Nickel Solar 12.5 14 Solar In Service
AH1-389 Utica East Ohio Midstream 138 kV 138 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.