Fleming Solar
PJM queue ID AF1-233
Fleming Solar (AF1-233) is listed in the PJM interconnection queue as a 113.1 MW solar project in Fleming County, KY. The filing names Flemingsburg – Spurlock as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of March 31, 2029.
| Queue ID | AF1-233 |
|---|---|
| Project name | Fleming Solar |
| Status (as published) | EP |
| Substation | Flemingsburg – Spurlock |
| Point of interconnection | Flemingsburg – Spurlock 138kV |
| County | Fleming |
| State | KY |
| Voltage | 138 kV |
| Capacity | 113.1 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-03-31 |
| Source dataset | cycle |
Same substation and county
Fleming, KY: 12 requests in the PJM queue, 5 active totaling 281.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | AEUG Fleming Solar, LLC |
|---|---|
| Transmission owner | EKPC |
| Project type | Generation Interconnection |
| Cycle | TC1 |
| Stage | FINAL AGREEMENT |
| MW energy | 188.5 |
| MW capacity | 113.1 |
| MFO | 188.5 |
| Submitted date | 9/27/2019 |
| Last updated | 2/9/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.