Substation Scout

Fleming Solar

PJM queue ID AF1-233

Fleming Solar (AF1-233) is listed in the PJM interconnection queue as a 113.1 MW solar project in Fleming County, KY. The filing names Flemingsburg – Spurlock as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of March 31, 2029.

Queue IDAF1-233
Project nameFleming Solar
Status (as published)EP
SubstationFlemingsburg – Spurlock
Point of interconnectionFlemingsburg – Spurlock 138kV
CountyFleming
StateKY
Voltage138 kV
Capacity113.1 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2029-03-31
Source datasetcycle

Same substation and county

Fleming, KY: 12 requests in the PJM queue, 5 active totaling 281.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperAEUG Fleming Solar, LLC
Transmission ownerEKPC
Project typeGeneration Interconnection
CycleTC1
StageFINAL AGREEMENT
MW energy188.5
MW capacity113.1
MFO188.5
Submitted date9/27/2019
Last updated2/9/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first