Union Solar (AF1-227) is listed in the PJM interconnection queue as a 195 MW solar project in Union County, OH. The filing names Marysville – Gunn Road as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2024.
| Queue ID | AF1-227 |
|---|---|
| Project name | Union Solar |
| Status (as published) | In Service |
| Substation | Marysville – Gunn Road |
| Point of interconnection | Marysville – Gunn Road 345 kV |
| County | Union |
| State | OH |
| Voltage | 345 kV |
| Capacity | 195 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2024-12-31 |
| Source dataset | serial |
Same substation and county
Union, OH: 35 requests in the PJM queue, 6 active totaling 572.2 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 325 |
| MW capacity | 195 |
| MFO | 325 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.