Henry County Solar
PJM queue ID AF1-205
Henry County Solar (AF1-205) is listed in the PJM interconnection queue as a 24 MW solar project in Henry County, OH. The filing names Napoleon Muni as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of August 1, 2026.
| Queue ID | AF1-205 |
|---|---|
| Project name | Henry County Solar |
| Status (as published) | Suspended |
| Substation | Napoleon Muni |
| Point of interconnection | Napoleon Muni 138 kV |
| County | Henry |
| State | OH |
| Voltage | 138 kV |
| Capacity | 24 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-08-01 |
| Source dataset | serial |
Same substation and county
Napoleon Muni substation: 3 requests in the PJM queue, 1 active totaling 24 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH2-288 | Napoleon Muni 138 kV | 82.4 | Battery | Withdrawn |
| AG1-319 | Napoleon Muni 138 kV | 39 | Solar | Withdrawn |
Henry, OH: 11 requests in the PJM queue, 1 active totaling 24 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 40 |
| MW capacity | 24 |
| MFO | 40 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.