Hunterstown CT Facility
PJM queue ID AF1-193
Hunterstown CT Facility (AF1-193) is listed in the PJM interconnection queue as a 4 MW gas project in Adams County, PA. The filing names Hunterstown as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 30, 2023.
| Queue ID | AF1-193 |
|---|---|
| Project name | Hunterstown CT Facility |
| Status (as published) | In Service |
| Substation | Hunterstown |
| Point of interconnection | Hunterstown 115 kV |
| County | Adams |
| State | PA |
| Voltage | 115 kV |
| Capacity | 4 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2023-09-30 |
| Source dataset | serial |
Same substation and county
Hunterstown substation: 9 requests in the PJM queue, 4 active totaling 2,131.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1881 | Hunterstown 230 kV | 931.1 | Gas | Active |
| A36 | Hunterstown | 830 | Gas | In Service |
| C01-1398 | Hunterstown 500 kV | 366.8 | Gas | Active |
| AB1-153 | Hunterstown 500kV | 985.1 | Gas | Withdrawn |
| A60 | Hunterstown 500 kV | 679 | Gas | Withdrawn |
| AE1-139 | Hunterstown 115 kV | 39 | Solar | Withdrawn |
| W4-022 | Hunterstown 230kV | 38 | Solar | Withdrawn |
| W1-075 | Hunterstown 115kV | 7.6 | Solar | Withdrawn |
Adams, PA: 86 requests in the PJM queue, 13 active totaling 2,270.3 MW.
A substation with the same name is named in PJM transmission planning materials: Hunterstown (METED, 5 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 4 |
| MW capacity | 4 |
| MFO | 65 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.