Substation Scout

Sayreville Facility (Raritan River)

PJM queue ID AF1-185

Sayreville Facility (Raritan River) (AF1-185) is listed in the PJM interconnection queue as a 5.5 MW gas project in Middlesex County, NJ. The filing names Sayreville 1-2-3 as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 10, 2020.

Queue IDAF1-185
Project nameSayreville Facility (Raritan River)
Status (as published)In Service
SubstationSayreville 1-2-3
Point of interconnectionSayreville 1-2-3 230 kV
CountyMiddlesex
StateNJ
Voltage230 kV
Capacity5.5 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2020-03-10
Source datasetserial

Same substation and county

Middlesex, NJ: 120 requests in the PJM queue, 33 active totaling 4,764.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy5.5
MW capacity5.5
MFO248.7

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.