Shawnee Generating Station (CT 1)
PJM queue ID AF1-184
Shawnee Generating Station (CT 1) (AF1-184) is listed in the PJM interconnection queue as a 1 MW project in Monroe County, PA. The filing names Shawnee 1 as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 30, 2023.
| Queue ID | AF1-184 |
|---|---|
| Project name | Shawnee Generating Station (CT 1) |
| Status (as published) | In Service |
| Substation | Shawnee 1 |
| Point of interconnection | Shawnee 1 34.5 kv |
| County | Monroe |
| State | PA |
| Voltage | 34.5 kV |
| Capacity | 1 MW |
| Resource (as published) | Oil |
| Resource category | Other (normalized for filtering) |
| Target commercial operation | 2023-09-30 |
| Source dataset | serial |
Same substation and county
Monroe, PA: 12 requests in the PJM queue, 2 active totaling 49 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 1 |
| MW capacity | 1 |
| MFO | 21 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.