Monroe, PA interconnection queue
2 active projects totalling 49 MW in the PJM queue, plus 10 with terminal status (shown greyed).
2active projects
49active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA1-017 | Portland 2 | n/r | 243 | Other | Withdrawn |
| AA1-016 | Portland 1 | n/r | 158 | Other | Withdrawn |
| AE2-175 | Swiftwater Solar | 69 | 48 | Solar | Partially in Service - Under Construction |
| AH2-152 | Effort Mountain-Gilbert 138 kV IV | 138 | 26.9 | Hybrid | Withdrawn |
| AG1-480 | Shawnee Solar and BESS | 34.5 | 18.2 | Hybrid | Withdrawn |
| AG1-283 | Effort Mountain-Gilbert 138 kV | 138 | 18 | Solar | Withdrawn |
| AG2-231 | Arrowhead 12 kV | 12 | 6.2 | Solar | Withdrawn |
| AG2-185 | Effort Mountain-Gilbert 138 kV | 138 | 6 | Solar | Withdrawn |
| AG2-186 | Effort Mountain-Gilbert 138 kV | 138 | 3.1 | Solar | Withdrawn |
| AF1-184 | Shawnee Generating Station (CT 1) | 34.5 | 1 | Other | In Service |
| AE1-202 | Effort Mountain 12.47 kV | 12.5 | 0 | Battery | Withdrawn |
| AH1-100 | Effort Mountain-Gilbert 138 kV II | 138 | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.