Substation Scout

Monroe, PA interconnection queue

2 active projects totalling 49 MW in the PJM queue, plus 10 with terminal status (shown greyed).

2active projects
49active MW
12total filed
Queue IDProjectkVMWResourceStatus
AA1-017 Portland 2 n/r 243 Other Withdrawn
AA1-016 Portland 1 n/r 158 Other Withdrawn
AE2-175 Swiftwater Solar 69 48 Solar Partially in Service - Under Construction
AH2-152 Effort Mountain-Gilbert 138 kV IV 138 26.9 Hybrid Withdrawn
AG1-480 Shawnee Solar and BESS 34.5 18.2 Hybrid Withdrawn
AG1-283 Effort Mountain-Gilbert 138 kV 138 18 Solar Withdrawn
AG2-231 Arrowhead 12 kV 12 6.2 Solar Withdrawn
AG2-185 Effort Mountain-Gilbert 138 kV 138 6 Solar Withdrawn
AG2-186 Effort Mountain-Gilbert 138 kV 138 3.1 Solar Withdrawn
AF1-184 Shawnee Generating Station (CT 1) 34.5 1 Other In Service
AE1-202 Effort Mountain 12.47 kV 12.5 0 Battery Withdrawn
AH1-100 Effort Mountain-Gilbert 138 kV II 138 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.