FU-Hanks Solar
PJM queue ID AF1-136
FU-Hanks Solar (AF1-136) is listed in the PJM interconnection queue as a 9.4 MW solar project in Fulton County, PA. The filing names Warfordsburg-Purcell Junction as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of April 27, 2027.
| Queue ID | AF1-136 |
|---|---|
| Project name | FU-Hanks Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Warfordsburg-Purcell Junction |
| Point of interconnection | Warfordsburg-Purcell Junction 34.5 kV |
| County | Fulton |
| State | PA |
| Voltage | 34.5 kV |
| Capacity | 9.4 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-04-27 |
| Source dataset | serial |
Same substation and county
Fulton, PA: 17 requests in the PJM queue, 2 active totaling 57.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 15.72 |
| MW capacity | 9.43 |
| MFO | 15.72 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.