Arche Energy Project (AF1-120) is listed in the PJM interconnection queue as a 26.6 MW solar project in Fulton County, OH. The filing names East Fayette 2 as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2023.

Queue IDAF1-120
Project nameArche Energy Project
Status (as published)In Service
SubstationEast Fayette 2
Point of interconnectionEast Fayette 2 138 kV
CountyFulton
StateOH
Voltage138 kV
Capacity26.6 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2023-12-31
Source datasetserial

Same substation and county

Fulton, OH: 13 requests in the PJM queue, 3 active totaling 189.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy40
MW capacity26.6
MFO107

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first