Pear Street Solar
PJM queue ID AF1-041
Pear Street Solar (AF1-041) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Atlantic County, NJ. The filing names Absecon as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 3, 2022.
| Queue ID | AF1-041 |
|---|---|
| Project name | Pear Street Solar |
| Status (as published) | In Service |
| Substation | Absecon |
| Point of interconnection | Absecon 12.47 kV |
| County | Atlantic |
| State | NJ |
| Voltage | 12.5 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2022-03-03 |
| Source dataset | serial |
Same substation and county
Absecon substation: 2 requests in the PJM queue, 2 active totaling 0.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AB1-001 | Oak Street Landfill Solar Project | 0.9 | Solar | In Service |
Atlantic, NJ: 93 requests in the PJM queue, 12 active totaling 301.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 2.4 |
| MW capacity | 0 |
| MFO | 2.4 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.