Sloopy Solar Energy Center (AE2-217) is listed in the PJM interconnection queue as a 108 MW solar project in Clark County, OH. The filing names East Springfield-London as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of July 27, 2029.

Queue IDAE2-217
Project nameSloopy Solar Energy Center
Status (as published)Engineering and Procurement
SubstationEast Springfield-London
Point of interconnectionEast Springfield-London 138 kV
CountyClark
StateOH
Voltage138 kV
Capacity108 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2029-07-27
Source datasetserial

Same substation and county

Clark, OH: 9 requests in the PJM queue, 1 active totaling 108 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy180
MW capacity108
MFO180

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first