Clark, OH interconnection queue

3 active projects totalling 1,970.2 MW in the PJM queue, plus 6 with terminal status (shown greyed).

3active projects
1,970.2active MW
9total filed
Queue IDProjectkVMWResourceStatus
C01-1973 Greene - Madison 345 kV 345 931.1 Gas Active
C01-1974 Greene - Madison 345 kV 345 931.1 Gas Active
AE2-217 Sloopy Solar Energy Center 138 108 Solar Engineering and Procurement
AH1-319 Sloopy Storage 138 54 Battery Withdrawn
AI2-156 East Springfield-London 138 kV III 138 43.2 Solar Withdrawn
AG2-385 North Hampton 69 kV 69 36.5 Solar Withdrawn
AG1-530 Not reported n/r 35.6 Solar Withdrawn
AG2-063 North Hampton 69 kV 69 34.5 Solar Withdrawn
AG2-378 North Hampton - Medway 69 kV 69 13.5 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.