Dover Solar
PJM queue ID AE2-211
Dover Solar (AE2-211) is listed in the PJM interconnection queue as a 23.1 MW solar project in York County, PA. The filing names Jackson-Three Mile Island as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of September 7, 2027.
| Queue ID | AE2-211 |
|---|---|
| Project name | Dover Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Jackson-Three Mile Island |
| Point of interconnection | Jackson-Three Mile Island 230 kV |
| County | York |
| State | PA |
| Voltage | 230 kV |
| Capacity | 23.1 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-09-07 |
| Source dataset | serial |
Same substation and county
York, PA: 76 requests in the PJM queue, 22 active totaling 2,107.2 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 55 |
| MW capacity | 23.1 |
| MFO | 55 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.