Pigeon Run Solar and Storage
PJM queue ID AE2-185
Pigeon Run Solar and Storage (AE2-185) is listed in the PJM interconnection queue as a 36 MW solar project in Campbell County, VA. The filing names Gladys DP-Stonemill Switching Station as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of March 1, 2031.
| Queue ID | AE2-185 |
|---|---|
| Project name | Pigeon Run Solar and Storage |
| Status (as published) | EP |
| Substation | Gladys DP-Stonemill Switching Station |
| Point of interconnection | Gladys DP-Stonemill Switching Station 69 kV |
| County | Campbell |
| State | VA |
| Voltage | 69 kV |
| Capacity | 36 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2031-03-01 |
| Source dataset | cycle |
Same substation and county
Campbell, VA: 26 requests in the PJM queue, 8 active totaling 2,498.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Pigeon Run Solar, LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | TC1 |
| Stage | FINAL AGREEMENT |
| MW energy | 60.0 |
| MW capacity | 36.0 |
| MFO | 60.0 |
| Submitted date | 3/18/2019 |
| Last updated | 8/17/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.