Swiftwater Solar

PJM queue ID AE2-175

Swiftwater Solar (AE2-175) is listed in the PJM interconnection queue as a 48 MW solar project in Monroe County, PA. The filing names Jackson-Long Pond as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2025.

Queue IDAE2-175
Project nameSwiftwater Solar
Status (as published)In Service
SubstationJackson-Long Pond
Point of interconnectionJackson-Long Pond 69 kV
CountyMonroe
StatePA
Voltage69 kV
Capacity48 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2025-12-31
Source datasetserial

Same substation and county

Monroe, PA: 12 requests in the PJM queue, 2 active totaling 49 MW.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-26 Status change n/a Partially in Service - Under Construction → In Service

Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy80
MW capacity48
MFO80

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.