Hanover Solar

PJM queue ID AE2-155

Hanover Solar (AE2-155) is listed in the PJM interconnection queue as a 3.5 MW solar project in Hanover County, VA. The filing names Old Church as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 1, 2020.

Queue IDAE2-155
Project nameHanover Solar
Status (as published)In Service
SubstationOld Church
Point of interconnectionOld Church 34.5 kV
CountyHanover
StateVA
Voltage34.5 kV
Capacity3.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2020-12-01
Source datasetserial

Same substation and county

Old Church substation: 8 requests in the PJM queue, 3 active totaling 28.4 MW.

Queue IDProjectMWResourceStatus
AB1-027Mechanicsville Solar14SolarIn Service
AC1-112Hollyfield Solar Facility10.9SolarIn Service
AI2-113Old Church 230 kV100BatteryWithdrawn
AC2-162Sweetspire13.2SolarWithdrawn
AC2-070Hollyfield II9.2SolarWithdrawn
AB1-059Old Church 34.5kV3.3SolarWithdrawn
AG2-240Old Church 34.5 kV0BatteryWithdrawn

Hanover, VA: 30 requests in the PJM queue, 9 active totaling 930.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy5
MW capacity3.5
MFO25

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first