Woodridge Solar
PJM queue ID AE2-092
Woodridge Solar (AE2-092) is listed in the PJM interconnection queue as a 82.8 MW solar project in Albemarle County, VA. The filing names Kidds Store-Sherwood as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of June 30, 2027.
| Queue ID | AE2-092 |
|---|---|
| Project name | Woodridge Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Kidds Store-Sherwood |
| Point of interconnection | Kidds Store-Sherwood 115 kV |
| County | Albemarle |
| State | VA |
| Voltage | 115 kV |
| Capacity | 82.8 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-06-30 |
| Source dataset | serial |
Same substation and county
Kidds Store-Sherwood substation: 2 requests in the PJM queue, 1 active totaling 82.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH2-092 | Kidds Store-Sherwood 115 kV | 32 | Battery | Withdrawn |
Albemarle, VA: 8 requests in the PJM queue, 1 active totaling 82.8 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 138 |
| MW capacity | 82.8 |
| MFO | 138 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.