Woodridge Solar

PJM queue ID AE2-092

Queue IDAE2-092
Project nameWoodridge Solar
Status (as published)Engineering and Procurement
SubstationKidds Store-Sherwood
Point of interconnectionKidds Store-Sherwood 115 kV
CountyAlbemarle
StateVA
Voltage115 kV
Capacity82.8 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2028-10-01
Source datasetserial

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy138
Mw Capacity82.8
Mfo138

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.