Henry County Solar Facility

PJM queue ID AE2-047

Henry County Solar Facility (AE2-047) is listed in the PJM interconnection queue as a 32.4 MW solar project in Henry County, VA. The filing names Ridgeway-Solite as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of June 30, 2028.

Queue IDAE2-047
Project nameHenry County Solar Facility
Status (as published)Engineering and Procurement
SubstationRidgeway-Solite
Point of interconnectionRidgeway-Solite 69 kV
CountyHenry
StateVA
Voltage69 kV
Capacity32.4 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-06-30
Source datasetserial

Same substation and county

Henry, VA: 19 requests in the PJM queue, 7 active totaling 1,053.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy50
MW capacity32.4
MFO50

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.