Substation Scout

Wolf Hills Energy Plant

PJM queue ID AE1-178

Wolf Hills Energy Plant (AE1-178) is listed in the PJM interconnection queue as a 19 MW gas project in Washington County, VA. The filing names Wolf Hills as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 21, 2021.

Queue IDAE1-178
Project nameWolf Hills Energy Plant
Status (as published)In Service
SubstationWolf Hills
Point of interconnectionWolf Hills 138 kV
CountyWashington
StateVA
Voltage138 kV
Capacity19 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2021-12-21
Source datasetserial

Same substation and county

Wolf Hills substation: 2 requests in the PJM queue, 2 active totaling 34 MW.

Queue IDProjectMWResourceStatus
N11Wolf Hills Energy Plant15GasIn Service

Washington, VA: 5 requests in the PJM queue, 2 active totaling 34 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy19
MW capacity19
MFO294

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first