Substation Scout

Justin Court Energy Storage

PJM queue ID AD2-213

Justin Court Energy Storage (AD2-213) is listed in the PJM interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Hunterdon County, NJ. The filing names East Flemington-Lebanon as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 14, 2023.

Queue IDAD2-213
Project nameJustin Court Energy Storage
Status (as published)In Service
SubstationEast Flemington-Lebanon
Point of interconnectionEast Flemington-Lebanon 34.5 kV
CountyHunterdon
StateNJ
Voltage34.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2023-07-14
Source datasetserial

Same substation and county

Hunterdon, NJ: 89 requests in the PJM queue, 26 active totaling 863.1 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity0
MFO20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first