Substation Scout

Buck & Byllesby Hydro Project

PJM queue ID AD2-205

Buck & Byllesby Hydro Project (AD2-205) is listed in the PJM interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Carroll County, VA. The filing names Byllesby as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2018.

Queue IDAD2-205
Project nameBuck & Byllesby Hydro Project
Status (as published)In Service
SubstationByllesby
Point of interconnectionByllesby 69 kV
CountyCarroll
StateVA
Voltage69 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2018-12-31
Source datasetserial

Same substation and county

Carroll, VA: 9 requests in the PJM queue, 2 active totaling 120 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy4
MW capacity0
MFO4

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.