Buck & Byllesby Hydro Project
PJM queue ID AD2-205
Buck & Byllesby Hydro Project (AD2-205) is listed in the PJM interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Carroll County, VA. The filing names Byllesby as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2018.
| Queue ID | AD2-205 |
|---|---|
| Project name | Buck & Byllesby Hydro Project |
| Status (as published) | In Service |
| Substation | Byllesby |
| Point of interconnection | Byllesby 69 kV |
| County | Carroll |
| State | VA |
| Voltage | 69 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2018-12-31 |
| Source dataset | serial |
Same substation and county
Carroll, VA: 9 requests in the PJM queue, 2 active totaling 120 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 4 |
| MW capacity | 0 |
| MFO | 4 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.