Buffalo Solar
PJM queue ID AD2-066
Buffalo Solar (AD2-066) is listed in the PJM interconnection queue as a 69.6 MW solar project in Grundy County, IL. The filing names Mazon-Crescent Ridge as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of November 30, 2026.
| Queue ID | AD2-066 |
|---|---|
| Project name | Buffalo Solar |
| Status (as published) | Partially in Service - Under Construction |
| Substation | Mazon-Crescent Ridge |
| Point of interconnection | Mazon-Crescent Ridge 138 kV |
| County | Grundy |
| State | IL |
| Voltage | 138 kV |
| Capacity | 69.6 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-11-30 |
| Source dataset | serial |
Same substation and county
Grundy, IL: 44 requests in the PJM queue, 18 active totaling 3,015.2 MW.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-16 | Status change | n/a | Under Construction → Partially in Service - Under Construction |
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 116 |
| MW capacity | 69.6 |
| MFO | 116 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.