Buffalo Solar

PJM queue ID AD2-066

Buffalo Solar (AD2-066) is listed in the PJM interconnection queue as a 69.6 MW solar project in Grundy County, IL. The filing names Mazon-Crescent Ridge as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of November 30, 2026.

Queue IDAD2-066
Project nameBuffalo Solar
Status (as published)Partially in Service - Under Construction
SubstationMazon-Crescent Ridge
Point of interconnectionMazon-Crescent Ridge 138 kV
CountyGrundy
StateIL
Voltage138 kV
Capacity69.6 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-11-30
Source datasetserial

Same substation and county

Grundy, IL: 44 requests in the PJM queue, 18 active totaling 3,015.2 MW.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-16 Status change n/a Under Construction → Partially in Service - Under Construction

Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy116
MW capacity69.6
MFO116

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.