Berkshire Solar
PJM queue ID AC2-175
Berkshire Solar (AC2-175) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Morris County, NJ. PJM lists its status as “In Service”, with a target commercial operation date of September 30, 2021.
| Queue ID | AC2-175 |
|---|---|
| Project name | Berkshire Solar |
| Status (as published) | In Service |
| Substation | Berkshire Solar |
| Point of interconnection | Berkshire Solar 12 kV |
| County | Morris |
| State | NJ |
| Voltage | 12 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2021-09-30 |
| Source dataset | serial |
Same substation and county
Morris, NJ: 22 requests in the PJM queue, 3 active totaling 14.8 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 1.6 |
| MW capacity | 0 |
| MFO | 1.6 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.
Site Scanner