Eaton OH Solar (AC2-068) is listed in the PJM interconnection queue as a 7.6 MW solar project in Preble County, OH. The filing names Camden-Crystal II as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of January 28, 2027.

Queue IDAC2-068
Project nameEaton OH Solar
Status (as published)Under Construction
SubstationCamden-Crystal II
Point of interconnectionCamden-Crystal II 69kV
CountyPreble
StateOH
Voltage69 kV
Capacity7.6 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-01-28
Source datasetserial

Same substation and county

Preble, OH: 15 requests in the PJM queue, 5 active totaling 79.1 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity7.6
MFO69.9

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first