Stagecoach Solar

PJM queue ID AC1-080

Stagecoach Solar (AC1-080) is listed in the PJM interconnection queue as a 12.8 MW solar project in Halifax County, VA. The filing names Perth-Hickory Grove as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2021.

Queue IDAC1-080
Project nameStagecoach Solar
Status (as published)In Service
SubstationPerth-Hickory Grove
Point of interconnectionPerth-Hickory Grove 115kV
CountyHalifax
StateVA
Voltage115 kV
Capacity12.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2021-12-31
Source datasetserial

Same substation and county

Perth-Hickory Grove substation: 2 requests in the PJM queue, 2 active totaling 51.1 MW.

Queue IDProjectMWResourceStatus
AC1-075Stagecoach Solar38.3SolarIn Service

Halifax, VA: 57 requests in the PJM queue, 25 active totaling 1,315.8 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity12.8
MFO80

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.