Freemall Fuel Cell Facility
PJM queue ID AB2-139
Freemall Fuel Cell Facility (AB2-139) is listed in the PJM interconnection queue as a request filed at 0 MW (a net change or energy-only filing) in Monmouth County, NJ. The filing names Raceway Mall as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 30, 2017.
| Queue ID | AB2-139 |
|---|---|
| Project name | Freemall Fuel Cell Facility |
| Status (as published) | In Service |
| Substation | Raceway Mall |
| Point of interconnection | Raceway Mall 34.5kV |
| County | Monmouth |
| State | NJ |
| Voltage | 34.5 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Other |
| Resource category | Other (normalized for filtering) |
| Target commercial operation | 2017-06-30 |
| Source dataset | serial |
Same substation and county
Monmouth, NJ: 79 requests in the PJM queue, 18 active totaling 46.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 0.42 |
| MW capacity | 0 |
| MFO | 0.42 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.