Brink Solar Project

PJM queue ID AB2-040

Brink Solar Project (AB2-040) is listed in the PJM interconnection queue as a 44 MW solar project in Greensville County, VA. The filing names Brink as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 1, 2024.

Queue IDAB2-040
Project nameBrink Solar Project
Status (as published)In Service
SubstationBrink
Point of interconnectionBrink 115kV
CountyGreensville
StateVA
Voltage115 kV
Capacity44 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2024-10-01
Source datasetserial

Same substation and county

Brink substation: 2 requests in the PJM queue, 1 active totaling 44 MW.

Queue IDProjectMWResourceStatus
AD1-047Brink 115 kV48SolarWithdrawn

Greensville, VA: 58 requests in the PJM queue, 14 active totaling 1,973.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy80
MW capacity44
MFO80

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.