Legler Landfill Solar Farm

PJM queue ID AB1-163

Legler Landfill Solar Farm (AB1-163) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Ocean County, NJ. The filing names Glidden-Van Hiseville as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 30, 2021.

Queue IDAB1-163
Project nameLegler Landfill Solar Farm
Status (as published)In Service
SubstationGlidden-Van Hiseville
Point of interconnectionGlidden-Van Hiseville 34.5 kV
CountyOcean
StateNJ
Voltage34.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2021-10-30
Source datasetserial

Same substation and county

Ocean, NJ: 55 requests in the PJM queue, 15 active totaling 653.1 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy2.88
MW capacity0
MFO2.88

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.