Bio Energy Landfill Facility
PJM queue ID AA2-100
Bio Energy Landfill Facility (AA2-100) is listed in the PJM interconnection queue as a 4.8 MW gas project in Brown County, OH. The filing names Brown as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 31, 2018.
| Queue ID | AA2-100 |
|---|---|
| Project name | Bio Energy Landfill Facility |
| Status (as published) | In Service |
| Substation | Brown |
| Point of interconnection | Brown 34.5kV |
| County | Brown |
| State | OH |
| Voltage | 34.5 kV |
| Capacity | 4.8 MW |
| Resource (as published) | Methane |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2018-10-31 |
| Source dataset | serial |
Same substation and county
Brown, OH: 15 requests in the PJM queue, 4 active totaling 124.8 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 4.8 |
| MW capacity | 4.8 |
| MFO | 4.8 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.