PJM queue ID AA2-048
Lakewood-Farmingdale Road Storage Facility (AA2-048) is listed in the PJM interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Monmouth County, NJ. The filing names Allenwood-Larrabee as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of August 31, 2022.
| Queue ID | AA2-048 |
|---|---|
| Project name | Lakewood-Farmingdale Road Storage Facility |
| Status (as published) | In Service |
| Substation | Allenwood-Larrabee |
| Point of interconnection | Allenwood-Larrabee 34kV |
| County | Monmouth |
| State | NJ |
| Voltage | 34 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2022-08-31 |
| Source dataset | serial |
Same substation and county
Monmouth, NJ: 79 requests in the PJM queue, 18 active totaling 46.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 7 |
| MW capacity | 0 |
| MFO | 7 |