Substation Scout

Perry Road Solar

PJM queue ID AA1-102

Perry Road Solar (AA1-102) is listed in the PJM interconnection queue as a 44.8 MW solar project in Somerset County, MD. The filing names Kings Creek-Loretto as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2023.

Queue IDAA1-102
Project namePerry Road Solar
Status (as published)In Service
SubstationKings Creek-Loretto
Point of interconnectionKings Creek-Loretto 138kV
CountySomerset
StateMD
Voltage138 kV
Capacity44.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2023-12-31
Source datasetserial

Same substation and county

Somerset, MD: 35 requests in the PJM queue, 4 active totaling 96.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy118
MW capacity44.8
MFO118

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.