Tazewell, IL interconnection queue
11 active projects totaling 1,743 MW in the MISO queue, plus 8 with terminal status (shown grayed).
11active projects
1,743active MW
19total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J2579 | Not reported | 138 | 362 | Solar | Withdrawn |
| J3946 | Not reported | n/r | 300 | Battery | Active |
| R1054 | Replacing 261 MW Coal with 615 MW Solar; Edwards Unit 2 | 69 | 261 | Hybrid | Withdrawn |
| J1926 | Not reported | n/r | 200 | Wind | Active |
| J2762 | Not reported | 138 | 200 | Battery | Withdrawn |
| J3043 | Not reported | n/r | 200 | Battery | Withdrawn |
| J3044 | Not reported | n/r | 200 | Solar | Withdrawn |
| J3298 | Not reported | n/r | 200 | Battery | Active |
| J2575 | Not reported | 138 | 198 | Battery | Active |
| R1056 | Replacing 179 MW Coal with 179 MW Solar; Edwards Unit 3 | 138 | 184.7 | Hybrid | Withdrawn |
| J3904 | Not reported | n/r | 175 | Battery | Active |
| J3905 | Not reported | n/r | 175 | Wind | Active |
| J1653 | Not reported | 138 | 150 | Solar | Active |
| J3242 | Not reported | 138 | 150 | Battery | Withdrawn |
| G515 | Not reported | 138 | 100 | Wind | Operational |
| J1725 | Not reported | 138 | 100 | Wind | Active |
| J3456 | Not reported | n/r | 100 | Wind | Active |
| J3359 | Not reported | 138 | 80 | Battery | Withdrawn |
| J1882 | Not reported | 138 | 45 | Battery | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.