Tazewell, IL interconnection queue

11 active projects totaling 1,743 MW in the MISO queue, plus 8 with terminal status (shown grayed).

11active projects
1,743active MW
19total filed
Queue IDProjectkVMWResourceStatus
J2579 Not reported 138 362 Solar Withdrawn
J3946 Not reported n/r 300 Battery Active
R1054 Replacing 261 MW Coal with 615 MW Solar; Edwards Unit 2 69 261 Hybrid Withdrawn
J1926 Not reported n/r 200 Wind Active
J2762 Not reported 138 200 Battery Withdrawn
J3043 Not reported n/r 200 Battery Withdrawn
J3044 Not reported n/r 200 Solar Withdrawn
J3298 Not reported n/r 200 Battery Active
J2575 Not reported 138 198 Battery Active
R1056 Replacing 179 MW Coal with 179 MW Solar; Edwards Unit 3 138 184.7 Hybrid Withdrawn
J3904 Not reported n/r 175 Battery Active
J3905 Not reported n/r 175 Wind Active
J1653 Not reported 138 150 Solar Active
J3242 Not reported 138 150 Battery Withdrawn
G515 Not reported 138 100 Wind Operational
J1725 Not reported 138 100 Wind Active
J3456 Not reported n/r 100 Wind Active
J3359 Not reported 138 80 Battery Withdrawn
J1882 Not reported 138 45 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.