Substation Scout

MISO request J3456

MISO queue ID J3456

Queue request J3456 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW wind project in Tazewell County, IL, according to Berkeley Lab’s queue data file. The filing names San Jose Rail Switching Station as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 31, 2028.

Queue IDJ3456
Project nameNot reported
Status (as published)Active
SubstationSan Jose Rail Switching Station
Point of interconnectionSan Jose Rail Switching Station
CountyTazewell
StateIL
VoltageNot reported
Capacity100 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2028-05-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Tazewell, IL: 19 requests in the MISO queue, 11 active totaling 1,743 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2023 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Study Phase: DPP 1
Queue date2024-04-18

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first