MISO request G515

MISO queue ID G515

Queue request G515 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW wind project in Tazewell County, IL, according to Berkeley Lab’s queue data file. The filing names Ameren Mason - Tazewell as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of October 1, 2007.

Queue IDG515
Project nameNot reported
Status (as published)Operational
SubstationAmeren Mason - Tazewell
Point of interconnectionAmeren Mason - Tazewell 138kV
CountyTazewell
StateIL
Voltage138 kV
Capacity100 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2007-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Tazewell, IL: 19 requests in the MISO queue, 11 active totaling 1,743 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2005-04-21
Interconnection agreement date2007-08-06
Operational date2007-10-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first