Substation Scout

MISO request J1653

MISO queue ID J1653

Queue request J1653 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW solar project in Tazewell County, IL, according to Berkeley Lab’s queue data file. The filing names San Jose Rail as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 15, 2026.

Queue IDJ1653
Project nameNot reported
Status (as published)Active
SubstationSan Jose Rail
Point of interconnectionSan Jose Rail 138kV
CountyTazewell
StateIL
Voltage138 kV
Capacity150 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-09-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

San Jose Rail substation: 2 requests in the MISO queue, 2 active totaling 195 MW.

Queue IDProjectMWResourceStatus
J1882Not reported45BatteryActive

Tazewell, IL: 19 requests in the MISO queue, 11 active totaling 1,743 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2020 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Not Started
Queue date2021-12-03
Interconnection agreement date2025-05-16

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first