Substation Scout

Pipestone, MN interconnection queue

12 active projects totaling 293.2 MW in the MISO queue, plus 11 with terminal status (shown grayed).

12active projects
293.2active MW
23total filed
Queue IDProjectkVMWResourceStatus
J891 Not reported 115 300 Wind Withdrawn
J1524 Not reported 115 200 Solar Withdrawn
J2065 Not reported 115 200 Solar Withdrawn
J1620 Not reported 115 125 Solar Active
G491 Not reported n/r 100 Wind Withdrawn
J426 Not reported 35.4 100 Wind Operational
J520 Not reported n/r 100 Wind Withdrawn
J577 Not reported 345 100 Wind Withdrawn
J905 Not reported 115 40 Solar Withdrawn
J045 Not reported 69 23.1 Wind Withdrawn
G621 Not reported 34.5 20 Wind Active
G184 Not reported n/r 14 Other Withdrawn
J558 Not reported 69 9.2 Wind Operational
G226 Not reported n/r 9 Wind Withdrawn
G285 Not reported 69 9 Wind Operational
G278 Not reported 69 8 Wind Operational
G382 Not reported 115 8 Wind Operational
G397 Not reported 115 5 Wind Operational
G185 Not reported 69 4 Wind Operational
G584 Not reported 34.5 3 Wind Withdrawn
G041 Not reported n/r 2 Wind Operational
G398 Not reported 115 2 Wind Operational
G081 Not reported n/r 1 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first