Substation Scout

Mclean, IL interconnection queue

11 active projects totaling 2,233 MW in the MISO queue, plus 16 with terminal status (shown grayed).

11active projects
2,233active MW
27total filed
Queue IDProjectkVMWResourceStatus
S1036 Surplus; G876/G877 345 400 Hybrid Active
J3482 Not reported n/r 350 Solar Withdrawn
J3991 Not reported n/r 340 Wind Active
J1676 Not reported 345 300 Wind Withdrawn
J3681 Not reported 345 300 Wind Active
J4118 Not reported 345 250 Battery Active
J3335 Not reported n/r 222 Wind Withdrawn
J2372 Not reported 138 200 Battery Withdrawn
J3467 Not reported n/r 200 Hybrid Withdrawn
J3566 Not reported n/r 198 Wind Active
G413 Not reported n/r 150 Wind Withdrawn
IP04 Not reported 138 150 Wind Operational
J1022 Not reported 138 150 Wind Operational
J2413 Not reported 138 150 Battery Withdrawn
S1040 Surplus; J734 n/r 135 Hybrid Active
J3602 Not reported n/r 110 Wind Active
J3990 Not reported n/r 100 Wind Active
J826 Not reported 138 100 Wind Operational
J884 Not reported 138 100 Solar Withdrawn
S1029 Surplus; J808 n/r 99 Hybrid Withdrawn
G501 Not reported n/r 79.2 Wind Withdrawn
IP02 Not reported n/r 79.2 Wind Withdrawn
IP03 Not reported n/r 79 Wind Withdrawn
IP01 Not reported 69 50 Wind Withdrawn
J778 Not reported n/r 12 Wind Withdrawn
G679 Not reported 34.5 9.9 Wind Withdrawn
J3598 Not reported n/r 9 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first