Surplus; G876/G877

MISO queue ID S1036

Surplus; G876/G877 (S1036) was listed in the MISO interconnection queue at the end of 2025 as a 400 MW hybrid project in Mclean County, IL, according to Berkeley Lab’s queue data file. The filing names Dickinson , Buffalo, MN as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 31, 2025.

Queue IDS1036
Project nameSurplus; G876/G877
Status (as published)Active
SubstationDickinson , Buffalo, MN
Point of interconnectionDickinson 345 kV, Buffalo, MN
CountyMclean
StateIL
Voltage345 kV
Capacity400 MW
Resource (as published)Wind+Other
Resource categoryHybrid (normalized for filtering)
Proposed online date2025-05-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Mclean, IL: 27 requests in the MISO queue, 11 active totaling 2,233 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityGREAT RIVER ENERGY
Project typeGeneration
Queue date2022-09-09
Components (hybrid)Wind 400 MW + Other

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.