Substation Scout

MISO request IP04

MISO queue ID IP04

Queue request IP04 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW wind project in Mclean County, IL, according to Berkeley Lab’s queue data file. The filing names Mcean County #9 , , Line as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 1, 2004.

Queue IDIP04
Project nameNot reported
Status (as published)Operational
SubstationMcean County #9 , , Line
Point of interconnectionMcean County #9 , 138 kV, Line 1382
CountyMclean
StateIL
Voltage138 kV
Capacity150 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2004-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Mclean, IL: 27 requests in the MISO queue, 11 active totaling 2,233 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2004-04-22
Interconnection agreement date2007-08-28
Operational date2004-12-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first