Martin, MN interconnection queue

7 active projects totaling 715 MW in the MISO queue, plus 7 with terminal status (shown grayed).

7active projects
715active MW
14total filed
Queue IDProjectkVMWResourceStatus
J3547 Not reported n/r 630 Gas Withdrawn
J671 Not reported n/r 400 Wind Withdrawn
H005 Not reported n/r 300 Wind Withdrawn
G164 Not reported 345 200 Wind Operational
J1566 Not reported n/r 150 Solar Active
S1080 Surplus; J1566 n/r 150 Battery Active
G263 Not reported n/r 105 Wind Operational
G386 Not reported 345 100 Wind Operational
G770 Not reported 161 100 Wind Withdrawn
H043 Not reported 69 50 Wind Withdrawn
G797 Not reported n/r 30 Wind Withdrawn
G494 Not reported n/r 20 Wind Withdrawn
G741 Not reported 69 8 Hybrid Operational
G319 Not reported 69 2 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first