Substation Scout

Surplus; J1566

MISO queue ID S1080

Surplus; J1566 (S1080) was listed in the MISO interconnection queue at the end of 2025 as a 150 MW battery project in Martin County, MN, according to Berkeley Lab’s queue data file. The filing names Rutland as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of July 30, 2028.

Queue IDS1080
Project nameSurplus; J1566
Status (as published)Active
SubstationRutland
Point of interconnectionRutland
CountyMartin
StateMN
VoltageNot reported
Capacity150 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2028-07-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Rutland substation: 2 requests in the MISO queue, 2 active totaling 300 MW.

Queue IDProjectMWResourceStatus
J1566Not reported150SolarActive

Martin, MN: 14 requests in the MISO queue, 7 active totaling 715 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySOUTHERN MINNESOTA MUNICIPAL POWER AGENCY
Project typeGeneration
Queue date2025-01-14

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first