MISO queue ID G319

Queue request G319 was listed in the MISO interconnection queue at the end of 2025 as a 2 MW project in Martin County, MN, according to Berkeley Lab’s queue data file. The filing names Truman Muni Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 1, 2005.

Queue IDG319
Project nameNot reported
Status (as published)Operational
SubstationTruman Muni Substation
Point of interconnectionTruman Muni 69kV Substation
CountyMartin
StateMN
Voltage69 kV
Capacity2 MW
Resource (as published)Diesel
Resource categoryOther (normalized for filtering)
Proposed online date2005-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Martin, MN: 14 requests in the MISO queue, 7 active totaling 715 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterG319 G319
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2003-03-28
Interconnection agreement date2004-07-26
Operational date2005-12-01
Withdrawn date2004-03-17

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first