Substation Scout

Marion, IL interconnection queue

4 active projects totaling 549 MW in the MISO queue, plus 3 with terminal status (shown grayed).

4active projects
549active MW
7total filed
Queue IDProjectkVMWResourceStatus
J2426 Not reported 138 200 Battery Withdrawn
J2427 Not reported 138 200 Solar Withdrawn
J2661 Not reported 345 200 Solar Withdrawn
J4204 Not reported n/r 200 Battery Active
J3224 Not reported 138 150 Hybrid Active
J3130 Not reported 138 100 Solar Active
J1266 Not reported 138 99 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.