MISO request J3130
MISO queue ID J3130
Queue request J3130 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW solar project in Marion County, IL, according to Berkeley Lab’s queue data file. The filing names Kinmundy to Salem as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2026.
| Queue ID | J3130 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Kinmundy to Salem |
| Point of interconnection | Kinmundy to Salem 138 kV |
| County | Marion |
| State | IL |
| Voltage | 138 kV |
| Capacity | 100 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2026-06-30 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Marion, IL: 7 requests in the MISO queue, 4 active totaling 549 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMEREN ILLINOIS |
|---|---|
| Cluster | DPP-2022 Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Study phase (as the queue printed it) | Study Phase: DPP 2; Post GIA Status: Not Started |
| Queue date | 2022-09-09 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.