Substation Scout

MISO request J4204

MISO queue ID J4204

Queue request J4204 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW battery project in Marion County, IL, according to Berkeley Lab’s queue data file. The filing names South Belleville as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2031.

Queue IDJ4204
Project nameNot reported
Status (as published)Active
SubstationSouth Belleville
Point of interconnectionSouth Belleville
CountyMarion
StateIL
VoltageNot reported
Capacity200 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2031-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Marion, IL: 7 requests in the MISO queue, 4 active totaling 549 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP Cycle Pending Central
Interconnection serviceNRIS
Project typeGeneration

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first