Jasper, IN interconnection queue

15 active projects totaling 6,134.5 MW in the MISO queue, plus 4 with terminal status (shown grayed).

15active projects
6,134.5active MW
19total filed
Queue IDProjectkVMWResourceStatus
E0042 Schahfer CCGTs n/r 2,739.8 Gas Active
R5062 Replacing 722 MW Coal with 285 MW of Battery and 437MW of Gas; Schahfer n/r 732.7 Gas Active
J3931 Not reported n/r 500 Solar Active
J1067 Not reported 345 240 Solar Active
J1069 Not reported 345 200 Wind Active
J1332 Not reported 345 200 Solar Withdrawn
J740 Not reported 345 200 Wind Withdrawn
J968 Not reported 345 200 Wind Operational
J1333 Not reported 345 199.5 Hybrid Operational
J1334 Not reported 345 199.5 Hybrid Operational
J1335 Not reported 345 199.5 Hybrid Operational
J1336 Not reported 345 199.5 Hybrid Active
J1339 Not reported 345 199.5 Hybrid Active
J1340 Not reported 345 199.5 Hybrid Active
J2144 Not reported 345 195 Gas Withdrawn
J643 Not reported 138 175 Solar Active
J847 Not reported 138 90 Solar Active
J1387 Not reported 69 60 Solar Active
J2781 Not reported n/r 35 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.