MISO request J643

MISO queue ID J643

Queue request J643 was listed in the MISO interconnection queue at the end of 2025 as a 175 MW solar project in Jasper County, IN, according to Berkeley Lab’s queue data file. The filing names Schahfer Tap (17 SCHAFR_TAP) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 1, 2021.

Queue IDJ643
Project nameNot reported
Status (as published)Active
SubstationSchahfer Tap (17 SCHAFR_TAP)
Point of interconnectionSchahfer Tap (17 SCHAFR_TAP)138kv
CountyJasper
StateIN
Voltage138 kV
Capacity175 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2021-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Jasper, IN: 19 requests in the MISO queue, 15 active totaling 6,134.5 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2016-AUG Central
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)GIA
Queue date2016-05-09
Interconnection agreement date2018-10-18
Operational date2023-06-24

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.