Substation Scout

Replacing 722 MW Coal with 285 MW of Battery and 437MW of Gas; Schahfer

MISO queue ID R5062

Replacing 722 MW Coal with 285 MW of Battery and 437MW of Gas; Schahfer (R5062) was listed in the MISO interconnection queue at the end of 2025 as a 732.7 MW gas project in Jasper County, IN, according to Berkeley Lab’s queue data file. The filing names SCHAHFER GEN STA as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2027.

Queue IDR5062
Project nameReplacing 722 MW Coal with 285 MW of Battery and 437MW of Gas; Schahfer
Status (as published)Active
SubstationSCHAHFER GEN STA
Point of interconnectionSCHAHFER GEN STA
CountyJasper
StateIN
VoltageNot reported
Capacity732.7 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2027-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Jasper, IN: 19 requests in the MISO queue, 15 active totaling 6,134.5 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNORTHERN INDIANA PUBLIC SERVICE COMPANY
Project typeGeneration
Queue date2024-12-23

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first