MISO request J1069
MISO queue ID J1069
Queue request J1069 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW wind project in Jasper County, IN, according to Berkeley Lab’s queue data file. The filing names Reynolds Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 20, 2023.
| Queue ID | J1069 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Reynolds Substation |
| Point of interconnection | Reynolds 345kV Substation |
| County | Jasper |
| State | IN |
| Voltage | 345 kV |
| Capacity | 200 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2023-04-20 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Reynolds Substation substation: 7 requests in the MISO queue, 6 active totaling 1,400.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| J2496 | Not reported | 400 | Battery | Active |
| J837 | Not reported | 200.1 | Wind | Operational |
| J838 | Not reported | 200.1 | Wind | Operational |
| J913 | Not reported | 200 | Solar | Operational |
| J968 | Not reported | 200 | Wind | Operational |
| G864 | Not reported | 200 | Wind | Withdrawn |
Jasper, IN: 19 requests in the MISO queue, 15 active totaling 6,134.5 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | NORTHERN INDIANA PUBLIC SERVICE COMPANY |
|---|---|
| Cluster | DPP-2018-APR Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Construction |
| Study phase (as the queue printed it) | Study Phase: GIA; Post GIA Status: Under Construction |
| Queue date | 2018-03-12 |
| Interconnection agreement date | 2021-10-12 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.